Mfg Part Number: CK 104 LONG LEAD
Alternate P/N: CK104LONGLEAD
NSN : 5910-00-113-5499
NIIN : 001135499
CAGE Code : 71590
Manufacturer: Crl Components Inc
Item Name : Capacitor Fixed Cer
FSC : FSC 5910 Capacitors
Here at Internet For Aviation, we have CK 104 LONG LEAD Capacitor Fixed Cer from Crl Components Inc, as well as a variety of other parts from reliable manufacturers. As the only independent distributor with a No China Sourcing policy, we go to great lengths to ensure that we source responsibly when it comes to certified standard items. If you’re in need of a specific CK 104 LONG LEAD to aid you in your aircraft repair capabilities, simply search by NSN part number, NSN or Cage Code on our parts directory. Submit an instant RFQ and a representative will get back to you in as little as 15 minutes.
Note : We Will Not Share Your Information To Any Third Parties.
We pride ourselves in our abilities to deliver quality superior grade aviation parts in a timely schedule. Thanks to the various supply chain locations that we have across the United States. We can execute fast shipping times that outpace our competitors. Unlike other competitors, we can promise same day shipping and delivery right to the very place you need. We’re leaders in our industry thanks to our parts streamlining process which includes quick stock and acquisition of the certified product and fast shipping. For whatever needs you have, be they Capacitor Fixed Cer and CK 104 LONG LEAD parts, we can procure and deliver in a schedule that fits with you! Contact us today for an immediate quote!
NSN | FSC | NIIN | CLS | Hazmat | DEMIL | Cancelled NSN |
---|---|---|---|---|---|---|
5910-00-113-5499 Item Description: Capacitor Fixed Cer | 5910 | 001135499 | 0 | P | A | |
CIIC | HCC | ESD | PMIC | Criticality | ENAC | |
U | A | A | 0 | |||
Part Number | ISC | RNVC | RNCC | HCC | MSDS | SADC |
CK 104 LONG LEAD | B | 1 | C | A |
MRC | Criteria | Characteristic |
---|---|---|
AAQL | BODY STYLE | W/O MTG FACILITIES TERMINAL(S) ON ONE SURFACE |
AARG | RELIABILITY INDICATOR | ESTABLISHED |
ABJT | TERMINAL LENGTH | 1.250 INCHES MINIMUM |
ADAU | BODY HEIGHT | 0.090 INCHES NOMINAL |
AEBP | CENTER TO CENTER DISTANCE BETWEEN TERMINALS PARALLEL TO LENGTH | 0.200 INCHES NOMINAL |
CQBF | INSULATION RESISTANCE AT MAXIMUM OPERATING TEMP | 10000.0 MEGOHMS |
CQBQ | CAPACITANCE VALUE PER SECTION | 0.100 MICROFARADS SINGLE SECTION |
CQJJ | NONDERATED OPERATING TEMP | -55.0 DEG CELSIUS MINIMUM AND 125.0 DEG CELSIUS MAXIMUM |
CWPM | DISSIPATION FACTOR AT REFERENCE TEMP IN PERCENT | 2.5000 |
CWSG | TERMINAL SURFACE TREATMENT | SOLDER |
TEST | TEST DATA DOCUMENT | 81349-MIL-C-39014 SPECIFICATION (INCLUDES ENGINEERING TYPE BULLETINS, BROCHURES,ETC., THAT REFLECT SPECIFICATION TYPE DATA IN SPECIFICATION FORMAT; EXCLUDES COMMERCIAL CATALOGS, INDUSTRY DIRECTORIES, AND SIMILAR TRADE PUBLICATIONS, REFLECTI |
ZZZK | SPECIFICATION/STANDARD DATA | 81349-MIL-C-39014/2 GOVERNMENT SPECIFICATION |
AARH | RELIABILITY FAILURE RATE LEVEL IN PERCENT | 0.0010 |
ADAQ | BODY LENGTH | 0.290 INCHES NOMINAL |
ADAT | BODY WIDTH | 0.290 INCHES NOMINAL |
AEBT | TERMINAL DIAMETER | 0.025 INCHES NOMINAL |
AEBZ | SCHEMATIC DIAGRAM DESIGNATOR | NO COMMON OR GROUNDED ELECTRODE(S) |
CQFB | VOLTAGE TEMP LIMITS PER SECTION IN PERCENT CAPACITANCE CHANGE | -25.0/+15.0 WITH RATED VOLTAGE APPLIED SINGLE SECTION |
CQWM | NONDERATED CONTINUOUS VOLTAGE RATING AND TYPE PER SECTION | 100.0 DC SINGLE SECTION |
CRTP | TOLERANCE RANGE PER SECTION | 10.00/+10.00 PERCENT SINGLE SECTION |
CWJK | CASE MATERIAL | PLASTIC |
CWPK | INSULATION RESISTANCE AT REFERENCE TEMP | 100000.0 MEGOHMS |
NHCF | NUCLEAR HARDNESS CRITICAL FEATURE | HARDENED |
TTQY | TERMINAL TYPE AND QUANTITY | 2 UNINSULATED WIRE LEAD |
Semiconductor's Certifications and Memberships
![]() |
“We Proudly Support Intrepid Fallen Heroes Fund that serves United States Military Personal experiencing the Invisible Wounds of War : Traumatic Brain Injury (TBI) and Post Traumatic Stress (PTS). Please visit website (www.fallenheroesfund.org) and help in their valiant effort”. |
We Hope that You'll Choose Buy Aviation Parts as Your Quick and Convenient Parts Distributor In the Future.
Request for Quote