Mfg Part Number: DD101 LONG LEAD
Alternate P/N: DD101LONGLEAD
NSN : 5910-00-678-8157
NIIN : 006788157
CAGE Code : 71590
Manufacturer: Crl Components Inc
Item Name : Capacitor Fixed Cer
FSC : FSC 5910 Capacitors
Here at Internet For Aviation, we have DD101 LONG LEAD Capacitor Fixed Cer from Crl Components Inc, as well as a variety of other parts from reliable manufacturers. As the only independent distributor with a No China Sourcing policy, we go to great lengths to ensure that we source responsibly when it comes to certified standard items. If you’re in need of a specific DD101 LONG LEAD to aid you in your aircraft repair capabilities, simply search by NSN part number, NSN or Cage Code on our parts directory. Submit an instant RFQ and a representative will get back to you in as little as 15 minutes.
Note : We Will Not Share Your Information To Any Third Parties.
We pride ourselves in our abilities to deliver quality superior grade aviation parts in a timely schedule. Thanks to the various supply chain locations that we have across the United States. We can execute fast shipping times that outpace our competitors. Unlike other competitors, we can promise same day shipping and delivery right to the very place you need. We’re leaders in our industry thanks to our parts streamlining process which includes quick stock and acquisition of the certified product and fast shipping. For whatever needs you have, be they Capacitor Fixed Cer and DD101 LONG LEAD parts, we can procure and deliver in a schedule that fits with you! Contact us today for an immediate quote!
NSN | FSC | NIIN | CLS | Hazmat | DEMIL | Cancelled NSN |
---|---|---|---|---|---|---|
5910-00-678-8157 Item Description: Capacitor Fixed Cer | 5910 | 006788157 | 0 | P | ||
CIIC | HCC | ESD | PMIC | Criticality | ENAC | |
U | A | 0 | ||||
Part Number | ISC | RNVC | RNCC | HCC | MSDS | SADC |
DD101 LONG LEAD | 1 | 1 | C | A |
MRC | Criteria | Characteristic |
---|---|---|
AAQL | BODY STYLE | W/O MTG FACILITIES, RADIAL TERMINALS |
AARG | RELIABILITY INDICATOR | NOT ESTABLISHED |
ABPM | BODY DIAMETER | 0.290 INCHES MAXIMUM |
AEBT | TERMINAL DIAMETER | 0.025 INCHES NOMINAL |
AEBZ | SCHEMATIC DIAGRAM DESIGNATOR | NO COMMON OR GROUNDED ELECTRODE(S) |
AGAV | END ITEM IDENTIFICATION | MISSILE, AI-TO-AIR, PHOEB=NIX (AIM-54); TELETYPE, MODEL 28; TEST CONSOLES, MINI-SACE; ENGINE, AIRCRAFT TF33-PW-102 (C-135E, EC-135H/K/P); MISSILE, AIR-TO-AIR, SPARROW (AIM-7); SUPPORT EQUIPMENT, MX PEACEKEEPER MISSILE; SUPPORT EQUIPMENT, B |
CQFB | VOLTAGE TEMP LIMITS PER SECTION IN PERCENT CAPACITANCE CHANGE | -56.0/+22.0 WITHOUT VOLTAGE APPLIED SINGLE SECTION |
CQJJ | NONDERATED OPERATING TEMP | 55.0 DEG CELSIUS MINIMUM AND 85.0 DEG CELSIUS MAXIMUM |
CQWM | NONDERATED CONTINUOUS VOLTAGE RATING AND TYPE PER SECTION | 1000.0 DC SINGLE SECTION |
CRTP | TOLERANCE RANGE PER SECTION | -10.00/+10.00 PERCENT SINGLE SECTION |
CWPK | INSULATION RESISTANCE AT REFERENCE TEMP | 10000.0 MEGOHMS |
FEAT | SPECIAL FEATURES | WEAPON SYSTEM ESSENTIAL |
ABJT | TERMINAL LENGTH | 1.500 INCHES MINIMUM |
ADAQ | BODY LENGTH | 0.156 INCHES MAXIMUM |
AEBS | CENTER TO CENTER DISTANCE BETWEEN TERMINALS PARALLEL TO DIAMETER | 0.250 INCHES NOMINAL |
CQBQ | CAPACITANCE VALUE PER SECTION | 100.000 PICOFARADS SINGLE SECTION |
CRTL | CRITICALITY CODE JUSTIFICATION | FEAT |
CWJK | CASE MATERIAL | PLASTIC |
CWSG | TERMINAL SURFACE TREATMENT | SOLDER |
TTQY | TERMINAL TYPE AND QUANTITY | 2 UNINSULATED WIRE LEAD |
Semiconductor's Certifications and Memberships
![]() |
“We Proudly Support Intrepid Fallen Heroes Fund that serves United States Military Personal experiencing the Invisible Wounds of War : Traumatic Brain Injury (TBI) and Post Traumatic Stress (PTS). Please visit website (www.fallenheroesfund.org) and help in their valiant effort”. |
We Hope that You'll Choose Buy Aviation Parts as Your Quick and Convenient Parts Distributor In the Future.
Request for Quote